BUCHAREST WEST LOGISTIC PARK
- Start of work:05.2006
- Completion: 12.2006
- Type: Infrastructure, Industrials
- Client: Portland Romania Industrial One s.r.l.
- Company: Heberger Constructii S.R.L.
- Concept: PBA International, Bucharest, Sector 2, Romania
- Architect: WGA West Group Architecture, Bucharest, Romania
- Country: Romania
- City: Bucharest
- Description: "Design & build" for the entire infrastructure incl. bridges and culverts, approx. 30.000 sq.m. roads and walkways, the entire gas, water, fire hydrant, drainage & sewage, electrical distribution, rainwater retention lake, pumping station, water treatment plant, street lighting etc.
plus „Design & Build“ contract for the construction of a warehouse, lenght approx. 345m, width approx. 100m. Cast-in-situ foundations, precast coloumns, steel roof structure with trapezoidal steel sheet roofing, wall cladding from steel cassettes, steel fibre concrete slab, loading docks, offices and landscaping.