A concrete frame structure is being built for Deutsche Bahn to carry a single-track, non-electrified railway line under a bridge. The structure is initially being constructed in a side-lying position and then moved into its final position – a process requiring the utmost precision and coordination.
With a span of approximately 5 meters, a height of 4.5 meters, and a width of 7.3 meters, the structure meets the requirements of modern railway infrastructure projects. The design combines efficient construction methods with high technical accuracy, ensuring long-lasting and safe operation.