Bitte aktivieren Sie Javascript, um die Seite nutzen zu können.

Karriere bei uns

E-Mobility

Erection of an electric charging station at Wonnegau service station

For our long-standing customer Netze BW, we erected an E-fast charging station at the Wonnegau service station including the necessary underground and cable line work.

In the course of erecting the rapid loading column for a type G 0 customer station supplied by the customer, we manufactured a station pit. The delivered charging station foundation was installed at the correct height, the necessary civil engineering work for cable connection was carried out. A charging station and transformer station and for a second location another planned charging station was prepared. The corresponding cables were drawn into empty tubes and connected to the station, including the insulation measurement according to DIN VDE 0100-600 and earth measurement. A pavement widening and adaptation necessary for this was implemented at the same time.

Ihr Ansprechpartner

Denise Gerhardt
Denise Gerhardt
Group Communication

+49 6235 930-250
denise.gerhardt@heberger.com

Speyer, Neubau Wohnquartier Loopside

Speyer, Neubau Wohnquartier Loopside

Speyer, Neubau Wohnquartier Loopside

In Speyer, direkt am Rhein gelegen, entsteht schlüsselfertig ein weiteres topmodernes Wohnquartier. Dort entstehen 2 Gebäude mit insgesamt 80 Eigentumswohnungen und einer gemeinsam nutzbaren Tiefgarage.

Öffne Formular
close slider

    Sie möchten mehr erfahren. Dann schreiben Sie uns!

    Bitte Zahl eingeben.