Bitte aktivieren Sie Javascript, um die Seite nutzen zu können.

Karriere bei uns

Logistics halll

Logistics and storage hall

Close to the Bavarian border, in the town of Cheb/Eger in the far west of the Czech Republic, our subsidiary Prefa-Praha built and handed over a logistics hall.

With a construction area of over 35,000 m² the warehouse and logistics hall is one of Prefa-Praha’s larger projects this year. Only when you take a look at the technical figures and see the pictures of the drone camera you can see the enormous dimension of the construction project: 1,700 precast concrete elements were delivered from Prague to the construction site in Cheb, 3,400 m³ concrete were necessary to produce the concrete elements, another 600 tons of steel were used for the reinforcement. 3 assembly teams with 3 cranes were in operation at the same time as the assembly peaks and were also responsible for the assembly of 3,000 m² prestressed hollow slabs.

Ihr Ansprechpartner

Denise Gerhardt
Denise Gerhardt
Group Communication

+49 6235 930-250
denise.gerhardt@heberger.com

Speyer, Neubau Wohnquartier Loopside

Speyer, Neubau Wohnquartier Loopside

Speyer, Neubau Wohnquartier Loopside

In Speyer, direkt am Rhein gelegen, entsteht schlüsselfertig ein weiteres topmodernes Wohnquartier. Dort entstehen 2 Gebäude mit insgesamt 80 Eigentumswohnungen und einer gemeinsam nutzbaren Tiefgarage.

Öffne Formular
close slider

    Sie möchten mehr erfahren. Dann schreiben Sie uns!

    Bitte Zahl eingeben.