Logistics hall
New design logistics hall for Brunner
The healthy and steady growth of the Brunner Group required an increase in storage capacity. As the first construction phase of a 25-year master plan to further develop Brunner GmbH at the Rheinau site, a new logistics centre was built in May 2017, just one kilometre from the main plant in Rheinau.
With this new construction, logistics activities will be raised to the most modern level, existing processes will be optimised and the ability to deliver will be increased. In future, the raw materials will be stored at 4,000 storage locations and picked and prepared just-in-time for production. HEBERGER was commissioned with the construction and supervision of a contract worth more than 3 million euros.