Bitte aktivieren Sie Javascript, um die Seite nutzen zu können.

Karriere bei uns

student apartments

Production of 725 prefabricated bathrooms

The student residence Campo Novo Mainz combines modern architecture and urban, student living in an ideal location. Modern and bright apartments were planned with great attention to detail and perfect functionality, equipped with high-quality and durable materials.

Campo Novo Mainz offers an ideal living solution for students as well as people in an educational relationship. The attractive apartments in Campo Novo Mainz set new standards in the area of “young living” and inspire with bright, modern rooms and high-quality furnishings. In order to be able to complete the project as soon as possible, the project developers relied on HEBERGER prefabricated bathroom solutions. 725 bathrooms were manufactured and equipped by us and then transported by truck and crane to the construction site, where the concrete cubes could be connected immediately.


Production and delivery of prefabricated bathrooms

  • Delivery 22 pieces per week
  • 33 weeks long
  • Construction time from 11/2015 to 3/2017
  • Number of storeys: 5
  • 6 months construction time reduction through the use of prefabricated bathrooms
  • Additional 6 months of rental income of 2.17 million euros
  • Additional 6 months saving of costs for foremen and site managers.

Ihr Ansprechpartner

Jürgen Tillmann
Jürgen Tillmann
Experte für Badsysteme

+49 5251 54076-21
j.tillmann@hellweg-badsysteme.de

Speyer, Neubau Wohnquartier Loopside

Speyer, Neubau Wohnquartier Loopside

Speyer, Neubau Wohnquartier Loopside

In Speyer, direkt am Rhein gelegen, entsteht schlüsselfertig ein weiteres topmodernes Wohnquartier. Dort entstehen 2 Gebäude mit insgesamt 80 Eigentumswohnungen und einer gemeinsam nutzbaren Tiefgarage.

Öffne Formular
close slider

    Sie möchten mehr erfahren. Dann schreiben Sie uns!

    Bitte Zahl eingeben.